Power station by the water
Power generation

895 MW power station: MPC from 54.1 to 18.4, then rolled out on all three turbines

Varnish in the lubricating oil caused valve problems on all three turbines at a power station supplying 2.5 million homes. After offline filtration on the first gas turbine, the MPC value fell from 54.1 to 18.4, and the solution was rolled out on all three turbines.

MPC (varnish potential), gas turbine 1

54.118.4
all 3 turbineswere fitted with the system after the results on the first
MPC 54.1 to 18.4varnish potential on the first gas turbine
14,000 litresof Shell Turbo 46 in the lubrication system
CustomerNatural gas-fired combined cycle power station (not named by the manufacturer)
Countrynot stated
System895 MW CCGT with two Siemens gas turbines and one steam turbine, oil volume 14,000 litres
FluidShell Turbo 46 turbine oil

A natural gas-fired combined cycle power station of 895 MW, enough for 2.5 million homes, had valve problems on both gas turbines and the steam turbine. Oil analyses pointed to varnish: degradation products in the oil that settle as deposits on valves and block filters. The station had standard filtration installed, but it did not solve the problem, and contractual supply commitments were at risk.

On the first gas turbine, Delta Xero cartridge filtration was connected to the lubrication system’s 14,000 litres of Shell Turbo 46, together with an inline particle counter so that oil quality could be followed continuously.

The MPC value, the recognised measure of varnish potential, fell from 54.1 to 18.4. The cleanliness code fell from ISO 22/16/11 to 14/13/10, and the number of particles above 4 µm from 34,448 to 151 per ml. On the second gas turbine the picture was the same: MPC from 49.5 to 15.3 and cleanliness code from ISO 23/20/11 to 14/13/09.

On the basis of those results, the station chose to roll the solution out on all three turbines.

The figures before and after

MeasurementBeforeAfter
MPC (varnish potential), gas turbine 154.118.4
ISO 4406 cleanliness code, gas turbine 122/16/1114/13/10
Particles above 4 µm per ml, gas turbine 134,448151
MPC (varnish potential), gas turbine 249.515.3
ISO 4406 cleanliness code, gas turbine 223/20/1114/13/09
Particles above 4 µm per ml, gas turbine 258,874132
Water content, gas turbine 118 ppm3 ppm