Bonus 300 kW: new gear oil was black after 19 days, 51 days later it was clean
The gearbox in a ten-year-old Bonus turbine was drained, flushed and refilled with new oil, but 19 days later the oil was already dark. After 51 days with a DX1525 the oil and the membrane patch were clean, and at the annual inspection the owner described the gearbox as pristine.
Oil appearance
Macrete Ireland Ltd runs a 300 kW Bonus wind turbine that supplies power to its precast concrete factory. The turbine’s three-stage gearbox is ten years old and holds 80 litres of gear oil. Despite regular servicing, the oil was dark and there were deposits inside the gearbox.
On 5 September 2023 the gearbox was drained, flushed and refilled with new mineral gear oil, ISO VG 320. Only 19 days later the new oil was already dark. Residual sludge and varnish from the gearbox surfaces had contaminated it again. The 0.45 µm membrane patch was heavily contaminated, and metallic debris was visible under the microscope.
On 24 September 2023 a DX1525-SV was fitted and ran the oil through the cartridge continuously, with no chemical additives and no oil cooling.
After 51 days the oil was visibly clearer, the membrane patch was clear, and the metallic debris was gone from the sample. The gearbox housing and components also showed less sludge and varnish. At the annual inspection one year after installation, the housing, gears, shafts and bearing surfaces were visibly cleaner, with nothing else done to clean them.
The figures before and after
| Measurement | Before | After |
|---|---|---|
| Oil appearance | dark 19 days after the oil change | visibly clearer after 51 days |
| Membrane patch 0.45 µm | heavily contaminated | clear |
| Metallic debris under the microscope | visible | none in the sample |
| Gearbox internals | sludge and varnish on housing and gears | visibly cleaner after 1 year with no other cleaning |
“After owning and operating this turbine for many years, we have never seen the gearbox look so clean. It is in pristine condition.”